Showing 15 results

Archival description
Dundee College of Technology
Print preview View:

Worked Example Files

Folders of worked example paperwork. The final folder also contains course exam papers and text books.

The worked examples are split into course years, with each providing a drawing for an aspect of a building, and a corresponding set of specifications and quantities. They are typed, in the majority of cases, however some are hand written, and include all calculations to demonstrate how quantities were calculated for inclusion in Bills of Quantities for issue to Contractors for tendering purposes and preparation of Final Accounts.

Dundee College of Technology

File 4 - Second Year Quantity Surveying

Construction and Materials tutorial notes and coursework; Formwork;
Diploma Part II Syllabus;

Construction notes on:-
Introduction to Quantity Surveyors Role in the Building Industry
Function and Uses of Bills of Quantities
The Evolution of the Bill of Quantities
Setting Out of Items and Dimensions
Statement Notes on measurement of different trades

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)
1 Dormer Slater Work (M)
2 Tilerwork Roof Tiler Work (M)
3 Roof Measurement Asphalt roofing (L)
4 Pitched Slate Roof Slater Work, Tile Work (alt) (M)
5 Asphalt Roofing Asphalt Roofing (L) Bituminous Felt (M)
6 Example A Roofing Measurement Asphalt Roofing (L), Bituminous Roofing (M)
7 Example B Roofing Measurement Asphalt Roofing (L)
8 The Bungalow – RICS intermediate Exam 1970 Roof Carpentry, Joinery Works (M,N,P)

Dundee College of Technology

File 5 - Second Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

9/ A1 Offices and Stores Excavations, Foundations, Brickwork, Drainage
(D,F,G,X)
9/ B2 Offices and Stores
17 Typical Window Details Joinery (P)
18 Framed Lined Door Joinery (P)
19 Door Types (Int and External) Joinery (P)
Rainwater Installation (Dwg 9) (S)
Plaster Work (Dwg 9) (U)
Glazier Work (Dwg 9) (V)
Plumber Work – Roof Lead Work (M)
Painter Work (W)
10 Room with Dormer Slater Work (M)
Plasterwork (Dwg 10) (U)
11 Office and Store (Workshop) Plaster Work (U)
12 4Apt Dwelling House Excavations, Foundations, Under Building
Superstructure (D,F,G.M,S,X)
Plumber Work (gutters etc) (M)
Drainage (X)
Roughcast Work (U)
13 Extension Excavations, Foundations, Under Building(D,F,G, N)
14 Simple Pitched Roof Carpentry Work, Joinery Work (N,P)
20 Sash and Case Window Details Joiner Work (P)
13 Purpose-made Casement Wdw Joiner Work (P)
No Number Cottage Carpenter Work (N)
1a 4 Apt Dwelling House
1b 4 Apt Dwelling House - Roof Roof Plumber Work / Lead Work (M)
No number Glazed Screen Glazier Work (V)
No number Bus Shelter and Public Convenience Excavations, Brick Work and Concrete Work(D,F,G,
No number Trussed Rafters Carpentry (N)
Sketch Excavator and Builder Work (D,F,G)
No number Lead Work Lead flashings to chimney (M)

Dundee College of Technology

File 6 – 2/3rd Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

1a 4 Apt Dwelling House Excavations, Brick Work, Concrete Work, Carpentry (D,F,G,N,P)
1b 4 Apt Dwelling House
1c 4 Apt Dwelling House (Sht 1)
1d 4 Apt Dwelling House (Sht 2)
No number 4 Apt Dwelling House (Sht 3)
2 King Roof Truss Carpentry (N)
3 Staircase with Details Carpentry, Joinery (N,P)
4 Open Well Staircase (Sht 1) Carpentry, Joinery (N,P)
5 Staircase Details (Sht 2) Carpentry, Joinery (N,P)
6 Timber Screen Carpentry, Joinery (N,P)
7 Screen and Door Details Carpentry, Joinery (N,P)
8 Casement Window and Plywood Lining Joinery, Plaster Work (P,U)
9 Window Opening Joinery (P)
10 Built Fitment Carpentry Work, Joinery Work (N,P)
11 Bracketting Carpentry Work, Plater Work (N,U)
12 Stone Work Brick Work (G)
13 Typical Brick Examples Brick Work (G)
14 Bottle Storage Room Excavation, Concrete Works (D,F,L)
15 Underpinning (a) (H,D,F,G)
16 Underpinning (b)
17 Reinforced Concrete Balcony Concrete Work (F
18 Concrete Garage Pit Excavation, Concrete Works (D,F,U,R)
19 Alteration Work Wall Linings, Joinery Work (U,P)

Accounting course notes
Construction Tutorial notes

Dundee College of Technology

File 8 – 3rd Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

20 Brick Garage Excavations, Foundations, Substructure, Superstructure, Precast Concrete, Pit, Roof Truss, Asbestos Cement Roof (D,G,F,R,N,M.)
21a Asphalt Tanking (L)
21b Asphalt Tanking (L)
22 Mild Steel Roof truss (Q)
23 Steel Work – 2 Storey Building (Q)
24 Framed Steel Work (Q)
25 Roof Light on Concrete Kerb (V)
26 Lantern Light Joinery, Glazing (P,V)
27 Marble Foyer Paving, Joinery (U,P)
28 Tiler Work 1 (U)
29 Tiler Work 2 (U)
30 Tiler Work 3 (U)
31 Terrazzo Work (U)
32 Panelling (Glazing) (V)
33/34 West Walton Church, Norfolk Leaded Glazing (V)
36 Tile Terrazzo Work (U)
37 Reinforced Concrete Stair (F)
38 Precast Concrete Cladding (F)
39 Reinforced Concrete Building (F)
40a and b RICS Final Exam Part 1 1970 (Various)
41 RICS Final Exam Part 1 1971 (Scots Candidates) (R)
42 Simple Railings (R)

Dundee College of Technology

Results 1 to 10 of 15