Worked Example Files

Folders of worked example paperwork. The final folder also contains course exam papers and text books.

The worked examples are split into course years, with each providing a drawing for an aspect of a building, and a corresponding set of specifications and quantities. They are typed, in the majority of cases, however some are hand written, and include all calculations to demonstrate how quantities were calculated for inclusion in Bills of Quantities for issue to Contractors for tendering purposes and preparation of Final Accounts.

Dundee College of Technology

File 9 – 3/4th Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

43 Boundary Wall (D,F,G,
44 Banda Drawing Lead Flat Roofing, Zinc Roofing, Copper covered flat roof, Copper covered flat roof with standing seems (M).
45 Lead flat Roof with Sloping upstand (M)
46 Lead Flat Roof with Box Gutter (M)
47 Copper Hipped Roof (M)
48 Parapet Gutter in Lead (M)
49 a and b Plumbing (S)
50 Stone Dressings (K)
51 Window Openings (G,F,K)
52 Stone Work (K)
No number Hot Water Installation (S)
1 Basement Excavations / Underpinning (D,H,G) (Civils)
2 Retaining Wall (D,F,J,G,K) (Civils)
3 Chimney Shaft (D,G,F,
4 Precast Concrete Piling / Concrete Building RICS Final Exam 1963 (E,F
5 Entrance Door (F)
6 Concrete Balcony (F)
7 Loading Bay (F)
8 Concrete Stair (F)
9 Reinforced Concrete Building (F)
10 Structural Steel Work Sheet 1 (Q)
11 Structural Steel Work Sheet 2 (Q)
12 Structural Steel Work (Q)

Dundee College of Technology

File 10 – 4th Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

13 Oriel Window (K)
14 Stone Work in Ashlar with semi- circular Arch (K)
15 Stone Work (G,K)
16 Stone Work – Glasgow High School (K)
17 Stone Work Panels and Pillasters (K)
18 Cupboard below Fume Cupboard (N,P)
19 Details for above 18 (N,P)
20 Details for above 18 (N,P)
21 Timber Curtain Walling Details (P)
22 Timber Curtain Walling Details (P)
23 Trusses to Octagonal Roof (N)
24 Trusses to Octagonal Roof (N)
25 Stairway (P)
26 Timber Screen (N,P)
27 Stone Tracery Cottingham Church (K,Y)
28 Panelling (N,P
29 Panelling
30 Panelling
31 Panelling
32 Panelling Details (P
33 Panelling Details
34 Marble Catafalque (U)
35 Mansard Roof (M)
36 Mansard Roof – Copper Roof Details
37 Alteration Works (C)
38 Demolitions and Alterations (C)
39 Forming Window Openings (C,K)
40 – 48 incl Plumbing (S)
No number Boundary Wall - Civil Engineering (Civils)
No number Carriageway – Civil Engineering (Civils)

Dundee College of Technology

Standard Method of Measurement of Building Works

Referred to as SMM6. Provides detailed information, classification tables and rules for measuring building works. Its intention is to give a uniform basis for measuring building works in order to facilitate industry wide consistency and benchmarking, to encourage the adoption of best practice and to help avoid disputes. The accompanying Practice Manual provides guidance and good practice on applying the standard in the measurement of building works.

Published by The Royal Institution of Chartered Surveyors, and the National Federation of Building Trades Employers, sixth edition.

Royal Institution of Chartered Surveyors

General Conditions of Contract Forms of Tender, Agreement and Bond for Works of Civil Engineering Construction

Provides standard conditions of contract and forms of tender, agreement and bond to be applied in connection with civil engineering construction works.

Published by The Institution of Civil Engineers, The Association of Consulting Engineers, and The Federation of Civil Engineering Contractors, fifth edition.

Institution of Civil Engineers

File 8 – 3rd Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

20 Brick Garage Excavations, Foundations, Substructure, Superstructure, Precast Concrete, Pit, Roof Truss, Asbestos Cement Roof (D,G,F,R,N,M.)
21a Asphalt Tanking (L)
21b Asphalt Tanking (L)
22 Mild Steel Roof truss (Q)
23 Steel Work – 2 Storey Building (Q)
24 Framed Steel Work (Q)
25 Roof Light on Concrete Kerb (V)
26 Lantern Light Joinery, Glazing (P,V)
27 Marble Foyer Paving, Joinery (U,P)
28 Tiler Work 1 (U)
29 Tiler Work 2 (U)
30 Tiler Work 3 (U)
31 Terrazzo Work (U)
32 Panelling (Glazing) (V)
33/34 West Walton Church, Norfolk Leaded Glazing (V)
36 Tile Terrazzo Work (U)
37 Reinforced Concrete Stair (F)
38 Precast Concrete Cladding (F)
39 Reinforced Concrete Building (F)
40a and b RICS Final Exam Part 1 1970 (Various)
41 RICS Final Exam Part 1 1971 (Scots Candidates) (R)
42 Simple Railings (R)

Dundee College of Technology

Preparation of an Operational Bill

Description of the methods used to produce an Operational Bill, with a discussion of the difference between this and normal quantity surveying practice.

Written by E. R. Skoyles, ARICS, AIQS.
Published by the Building Research Station, Ministry of Public Building and Works.

E. R. Skoyles