Showing 393 results

Archival description
Print preview View:

3 results with digital objects Show results with digital objects

General Conditions of Contract Forms of Tender, Agreement and Bond for Works of Civil Engineering Construction

Provides standard conditions of contract and forms of tender, agreement and bond to be applied in connection with civil engineering construction works.

Published by The Institution of Civil Engineers, The Association of Consulting Engineers, and The Federation of Civil Engineering Contractors, fifth edition.

Institution of Civil Engineers

File 9 – 3/4th Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

43 Boundary Wall (D,F,G,
44 Banda Drawing Lead Flat Roofing, Zinc Roofing, Copper covered flat roof, Copper covered flat roof with standing seems (M).
45 Lead flat Roof with Sloping upstand (M)
46 Lead Flat Roof with Box Gutter (M)
47 Copper Hipped Roof (M)
48 Parapet Gutter in Lead (M)
49 a and b Plumbing (S)
50 Stone Dressings (K)
51 Window Openings (G,F,K)
52 Stone Work (K)
No number Hot Water Installation (S)
1 Basement Excavations / Underpinning (D,H,G) (Civils)
2 Retaining Wall (D,F,J,G,K) (Civils)
3 Chimney Shaft (D,G,F,
4 Precast Concrete Piling / Concrete Building RICS Final Exam 1963 (E,F
5 Entrance Door (F)
6 Concrete Balcony (F)
7 Loading Bay (F)
8 Concrete Stair (F)
9 Reinforced Concrete Building (F)
10 Structural Steel Work Sheet 1 (Q)
11 Structural Steel Work Sheet 2 (Q)
12 Structural Steel Work (Q)

Dundee College of Technology

File 8 – 3rd Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

20 Brick Garage Excavations, Foundations, Substructure, Superstructure, Precast Concrete, Pit, Roof Truss, Asbestos Cement Roof (D,G,F,R,N,M.)
21a Asphalt Tanking (L)
21b Asphalt Tanking (L)
22 Mild Steel Roof truss (Q)
23 Steel Work – 2 Storey Building (Q)
24 Framed Steel Work (Q)
25 Roof Light on Concrete Kerb (V)
26 Lantern Light Joinery, Glazing (P,V)
27 Marble Foyer Paving, Joinery (U,P)
28 Tiler Work 1 (U)
29 Tiler Work 2 (U)
30 Tiler Work 3 (U)
31 Terrazzo Work (U)
32 Panelling (Glazing) (V)
33/34 West Walton Church, Norfolk Leaded Glazing (V)
36 Tile Terrazzo Work (U)
37 Reinforced Concrete Stair (F)
38 Precast Concrete Cladding (F)
39 Reinforced Concrete Building (F)
40a and b RICS Final Exam Part 1 1970 (Various)
41 RICS Final Exam Part 1 1971 (Scots Candidates) (R)
42 Simple Railings (R)

Dundee College of Technology

File 6 – 2/3rd Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

1a 4 Apt Dwelling House Excavations, Brick Work, Concrete Work, Carpentry (D,F,G,N,P)
1b 4 Apt Dwelling House
1c 4 Apt Dwelling House (Sht 1)
1d 4 Apt Dwelling House (Sht 2)
No number 4 Apt Dwelling House (Sht 3)
2 King Roof Truss Carpentry (N)
3 Staircase with Details Carpentry, Joinery (N,P)
4 Open Well Staircase (Sht 1) Carpentry, Joinery (N,P)
5 Staircase Details (Sht 2) Carpentry, Joinery (N,P)
6 Timber Screen Carpentry, Joinery (N,P)
7 Screen and Door Details Carpentry, Joinery (N,P)
8 Casement Window and Plywood Lining Joinery, Plaster Work (P,U)
9 Window Opening Joinery (P)
10 Built Fitment Carpentry Work, Joinery Work (N,P)
11 Bracketting Carpentry Work, Plater Work (N,U)
12 Stone Work Brick Work (G)
13 Typical Brick Examples Brick Work (G)
14 Bottle Storage Room Excavation, Concrete Works (D,F,L)
15 Underpinning (a) (H,D,F,G)
16 Underpinning (b)
17 Reinforced Concrete Balcony Concrete Work (F
18 Concrete Garage Pit Excavation, Concrete Works (D,F,U,R)
19 Alteration Work Wall Linings, Joinery Work (U,P)

Accounting course notes
Construction Tutorial notes

Dundee College of Technology

File 5 - Second Year Quantity Surveying

Worked Examples (format is Drawing No; Drawing Title; Model (all references in brackets are to the Standard Method of Measurement of Building Works Edition 5 (SMM) Sections)

9/ A1 Offices and Stores Excavations, Foundations, Brickwork, Drainage
(D,F,G,X)
9/ B2 Offices and Stores
17 Typical Window Details Joinery (P)
18 Framed Lined Door Joinery (P)
19 Door Types (Int and External) Joinery (P)
Rainwater Installation (Dwg 9) (S)
Plaster Work (Dwg 9) (U)
Glazier Work (Dwg 9) (V)
Plumber Work – Roof Lead Work (M)
Painter Work (W)
10 Room with Dormer Slater Work (M)
Plasterwork (Dwg 10) (U)
11 Office and Store (Workshop) Plaster Work (U)
12 4Apt Dwelling House Excavations, Foundations, Under Building
Superstructure (D,F,G.M,S,X)
Plumber Work (gutters etc) (M)
Drainage (X)
Roughcast Work (U)
13 Extension Excavations, Foundations, Under Building(D,F,G, N)
14 Simple Pitched Roof Carpentry Work, Joinery Work (N,P)
20 Sash and Case Window Details Joiner Work (P)
13 Purpose-made Casement Wdw Joiner Work (P)
No Number Cottage Carpenter Work (N)
1a 4 Apt Dwelling House
1b 4 Apt Dwelling House - Roof Roof Plumber Work / Lead Work (M)
No number Glazed Screen Glazier Work (V)
No number Bus Shelter and Public Convenience Excavations, Brick Work and Concrete Work(D,F,G,
No number Trussed Rafters Carpentry (N)
Sketch Excavator and Builder Work (D,F,G)
No number Lead Work Lead flashings to chimney (M)

Dundee College of Technology

Results 291 to 300 of 393